William "Chops" Westfield wrote: > "you can't put engineering stock into the Production part chain." I think this has at least also something to do with the way USA-style=20 sales tax works (as opposed to Europe-style VAT). When you buy a part in=20 the USA, you buy it as engineering part or as a production part, and I=20 don't think USA accounting systems have a way to pass parts between the=20 two. (This distinction doesn't exist with Europe-style VAT.) Gerhard --=20 http://www.piclist.com PIC/SX FAQ & list archive View/change your membership options at http://mailman.mit.edu/mailman/listinfo/piclist .