In SX Microcontrollers, SX/B Compiler and SX-Key Tool, kgracey wrote: @WBA Consulting - Andrew: That's correct. I'll reply in more detail this weekend when I have the opportunity to address every question in a single reply, but your analysis is correct. We review the monthly and annual quantities for each product. In the case of our core business (the BS2p series, for example) we'll store a 15-20 year supply of SX chips since there is no easy redesign alternative and stable firmware is a core necessity of the product line. Something like the Ping))) will be redesigned with a low-cost microcontroller (has only a few dozen lines of code in the SX), so we will hold a two-year supply for that part while we redesign and get it into production. It's a big spreadsheet of boring stuff, but you've got the idea. The challenge our company faces right now is the one posed by Ubicom: place your final order, Parallax. The second challenge we face is to convince our customers that the BASIC Stamp 2p supply will not be affected (at least for a long time). At present it appears that we'll order a three-year supply for our customers/distributors plus whatever they want to guarantee through allocation by being backed up by a purchase order. I know this is serious stuff; I had to EOL the SX52 several years ago and personally answered every question relative to its supply since then. More to follow - need to sign off for the day. Sincerely, Ken Gracey ---------- End of Message ---------- You can view the post on-line at: http://forums.parallax.com/forums/default.aspx?f=7&p=1&m=372426#m372522 Need assistance? Send an email to the Forum Administrator at forumadmin@parallax.com The Parallax Forums are powered by dotNetBB Forums, copyright 2002-2009 (http://www.dotNetBB.com)