From page 240 of the GE SCR Manual (1979) is the following: E 1 Eo = --------- sqrt(pi-a+ --- sin(2a)) sqrt(2*pi) 2 where Eo is the RMS output voltage E is peak AC voltage a is turn-on phase delay in radians (trigger triac a radians past zero-cross) This is for full-wave control (triac or inverse parallel SCRs) into a resistive load. Glad I didn't have to derive it! Harold -------- Dove Systems phone +1 805 541 8292 3563 Sueldo Street, Suite E fax +1 805 541 8293 San Luis Obispo, CA 93401 email dove@dovesystems.com USA WWW http://www.dovesystems.com