[Menu]>[Electronic circuit engineering introduction]>[Assembly process]
![]() | Check the ground wiring |
![]() | Check +12V wiring |
![]() | Check +5V wiring |
![]() | Check other wiring |
![]() | Check the shotage of the power line |
![]() |
![]() | Connection of the power supply |
![]() | Check the power supply voltage |
![]() | Mount the IC1 |
![]() | Check the operation |
![]() |